Client: Golder Associates
Brief: Conduct CPTu testing through a wharf and into the Brisbane River bed to determine soil stratigraphy.
Challenges: Possible buckling of the CPT string between the wharf and the river bed.
Client: Golder Associates
Brief: Conduct CPTu testing through a wharf and into the Brisbane River bed to determine soil stratigraphy.
Challenges: Possible buckling of the CPT string between the wharf and the river bed.